Skip to content

Concrete Calculator

Slabs, footings, columns and steps, in yards, feet, metres and bags.

Work out how much concrete a slab, footing, column or flight of steps needs, in cubic yards, metres or bags, with the waste allowance built in.

Written and maintained by Mohit PatelLast checked August 4, 2026How we build these
What are you pouring

Patios, driveways, garage floors, shed bases.

Order this much5.50cubic yards
Volume needed
4.938 yd³
In cubic feet
133.33 ft³
In cubic metres
3.776
With 10% waste, rounded up
5.50 yd³

Suppliers deliver in quarter-yard steps and will not part-fill one, so this always rounds up. A pour that runs short cannot be topped up an hour later.

Or buy it in bags

245 bags

19,600 lb in total. That is well past the point where ready-mix is the sensible answer: most suppliers deliver from one cubic yard, and mixing this by hand is a day of work and an uneven pour.

How the Concrete Calculator works

Enter the dimensions and get the volume in cubic yards, cubic feet, cubic metres and bags. Every field states its unit, because slab thickness is quoted in inches while the slab is in feet and a calculator that leaves that implied returns an answer a hundred and forty-four times too large. The order quantity adds a waste allowance and rounds up to the quarter yard suppliers actually deliver in.

Also known as: concrete slab calculator · how much concrete do i need · cubic yards of concrete · concrete bags calculator · cement calculator

Frequently asked questions

How much concrete do I need for a 20 by 20 slab?

At four inches thick, 133.3 cubic feet, which is 4.94 cubic yards or 3.78 cubic metres. With a ten percent waste allowance you would order 5.5 yards, since suppliers deliver in quarter-yard steps and round up.

Why add a waste allowance?

Because subgrade is never perfectly level and forms bow outward under the weight of wet concrete. Ten percent is the usual figure. Running short matters far more than running over: a pour cannot be topped up an hour later, and a cold joint through the middle of a slab is a permanent weakness.

How many bags of concrete is a cubic yard?

Forty-five eighty-pound bags, which weigh 3,600 pounds in total. That is the point where ready-mix stops being a luxury: most suppliers deliver from one cubic yard, and mixing forty-five bags by hand is a day of work and an uneven pour.

Why are steps not just a box?

Because a flight is a staircase of prisms, not a wedge or a block. The bottom step runs the full depth, the next is one tread shorter, and so on. Treating three steps as their outer envelope overestimates by about half, which on a real flight is most of a cubic yard.

Cubic yards or cubic metres?

Cubic yards in the United States, cubic metres almost everywhere else. Both are shown. Note that a cubic yard is 27 cubic feet rather than three: dividing by three instead is a common and expensive slip.

Related calculators